Hi Timothy,
- Create standard bar 12 feet long as ROH material. Eg; A
- Create 5 feet long ribs as HALB material Eg; B
- Create 2 feet long ribs as HALB material and check the indicator Co-product in material master MRP 2 view. Eg : C
- Create BOM for 5 feet long HALB material (B) with base qty as 2 and child materials as A and C.
For material A (12 feet long) maintain the BOM qty as 1 and for C (2 feet long) maintain minus 1 qt) - System understand that when order is created to cut 2 qty of 5 feet long ribs it consumes 1 bar of 12 feet and produces 2 qty of 5 feet long rib and 1 qty of 2 feet long rib.
- If 2 feet long rib is completely non usable scrap then the above process is not required, instead go by defining as assembly scrap
Thanks & Regards,
Ramagiri